38 active projects · click a row to see its full timeline

In Transit

Aepex60 Keyboards Est. shipping Late Nov – Dec 2026 In Transit · Train Last update · Oct 20, 2026 In transit by train to France
  1. Oct 20, 2026 In transit by train to France Our Chinese forwarder received the boards this week, and they are now in transit by train to our warehouse in France. We should receive the shipment between late November and December.
  2. Sep 18, 2026 Production ends late October According to KBDfans, production should be completed by the end of October. After that, the boards will be shipped by train from China to our warehouse. We plan to ship orders around November or December.
  3. Jun 15, 2026 Invoice paid We received and paid the invoice from KBDfans. Production is planned to be completed in Q4 2026!
SWG Classic Blue Keycaps Est. shipping Late November 2026 In Transit · Air Last update · Nov 13, 2026 In transit by air
  1. Nov 13, 2026 In transit by air The sets are in transit by air to our warehouse in France. We expect to receive them next week and will ship your orders right after.
  2. Oct 30, 2026 Shipped by Swagkeys Swagkeys has completed production and shipped the sets to vendors.
  3. Jul 24, 2026 Production progressing well Production is progressing well! Swagkeys plans to ship the sets to vendors in September.
View product
F-ROW Keyboard Stand Accessories Est. shipping December 2026 – January 2027 In Transit · Train Last update · Nov 13, 2026 In transit by train
  1. Nov 13, 2026 In transit by train Production is completed, and the keyboard stands are now in transit by train to our warehouse in France. We expect to ship your orders between December 2026 and January 2027.
View product

Shipping Orders

Abstract Minimal Keycaps Est. shipping Shipping now Shipping Orders Last update · Sep 29, 2026 Sets received from Keyreative
  1. Sep 29, 2026 Sets received from Keyreative We finally received the sets from Keyreative, and they look fantastic! Cables: the cables are finishing production. According to Wired In, production should be completed in about two weeks, so orders that include a cable will ship around mid-October. Artisans: Salvun has been extremely busy over the past few months, and the artisans are behind schedule. We now expect them to be completed in Q4 2026. Orders containing an artisan will ship without it, and the artisan will follow separately.
  2. Aug 7, 2026 Sets shipping at the end of August According to Keyreative, the sets should be shipped around the end of August!
  3. Jun 7, 2026 Validating the FR & ES molds We are currently validating the FR & ES molds for Abstract Minimal with Keyreative. Production is planned to be completed in Q3 2026.

In Production

GMK Arcade Keycaps Est. shipping Q1 2027 In Production Last update · Oct 1, 2026 Invoice paid
  1. Oct 1, 2026 Invoice paid We received and paid the invoice from GMK. Production is starting.
  2. Sep 15, 2026 Order list sent to GMK We sent our order list to GMK and are now waiting for the invoice.
View product
Cloudnine 60% EC Parts Keyboards Est. shipping December 2026 In Production Last update · Nov 13, 2026 Production completes in December
  1. Nov 13, 2026 Production completes in December Production of the EC parts is progressing, and Machina expects it to be completed in December.
View product
Cloudnine 60% R2 Keyboards Est. shipping SS Black units: to be confirmed SS Black in Production Last update · Sep 18, 2026 SS Black units being remade
  1. Sep 18, 2026 SS Black units being remade This update only concerns the SS Black Cloudnine 60%. Full-body PVD coating over raw stainless steel is an extremely demanding process. During their in-person quality control, most of this batch did not meet Machina’s standards. Rather than compromise on the final quality, Machina made the tough decision to have the units remade, and their manufacturing partner is working with them to fine-tune the process. They need an additional 15 days. Machina should receive a first small batch to inspect and validate today, and will share more details soon.
  2. Apr 12, 2026 CNC and PCBs progressing well CNC machining and PCB production are progressing very well! The current ETA is still Q2, with the latest timeline pointing to mid-June. After that, the boards will travel by air to our warehouse in France, so we expect to ship the Cloudnine to you in July.
  3. Jan 2, 2026 Invoice paid We received and paid the invoice on January 2. Production is starting!
  4. Nov 29, 2025 Final list sent to Machina We sent the complete list to Machina. Production will start in December.
  5. Oct 17, 2025 Group-buy opens The Cloudnine R2 group-buy officially starts!
KKB Cobalt Keycaps Est. shipping Q1 2027 In Production Last update · Nov 3, 2026 Invoice paid
  1. Nov 3, 2026 Invoice paid We received and paid the invoice from Keykobo. Production is starting, and shipping is still planned for Q1 2027.
View product
SWG Evil Eye Keycaps Est. shipping Q1 2027 In Production Last update · Nov 13, 2026 Color matching in progress
  1. Nov 13, 2026 Color matching in progress Color matching is in progress at Swagkeys.
  2. Nov 1, 2026 Invoice paid We received and paid the invoice from Swagkeys. Production is starting once color matching is validated.
  3. Aug 21, 2026 Order list sent to Swagkeys We sent our order list to Swagkeys and are now waiting for the invoice.
View product
Feralis Pangea Mini IM Case Keyboards Est. shipping Q1 2027 In Production Last update · Sep 28, 2026 Group-buy closed
  1. Sep 28, 2026 Group-buy closed The group-buy ran from August 31 to September 28, 2026. Thank you for joining!
SWG Feralis Keycaps Est. shipping Q2 2027 In Production Last update · Nov 13, 2026 Waiting for production
  1. Nov 13, 2026 Waiting for production Feralis is queued for production at Swagkeys; color matching has not started yet. Shipping is still planned for Q2 2027.
  2. Oct 2, 2026 Invoice paid We received and paid the invoice from Swagkeys. Shipping is planned for Q2 2027.
View product
Gehirn60 Keyboards Est. shipping End Q3 – Q4 2026 In Production Last update · Jul 18, 2026 CNC nearly done, anodizing under way
  1. Jul 18, 2026 CNC nearly done, anodizing under way Production is progressing very well! CNC work is nearly completed, and the boards are currently being anodized. The plates are completed, and the PCBs should arrive in the next few weeks. According to the manufacturer, production should be completed at the end of Q3 (September). The Gehirn60 will then travel by train to our warehouse in France, which takes around 35 to 45 days, so we expect arrival around mid-Q4. If production takes longer than planned for any reason, we will import the boards by air to avoid delaying the original estimate.
  2. Apr 1, 2026 Invoice paid We received and paid the invoice from STR. Production is starting!
View product
SWG Hazakura Light Keycaps Est. shipping Q1 2027 In Production Last update · Nov 13, 2026 Color matching completed
  1. Nov 13, 2026 Color matching completed Color matching is completed, and the sets are now waiting for production at Swagkeys.
View product
SWG Heartbreaker Keycaps Est. shipping Q1 2027 In Production Last update · Nov 13, 2026 Color matching in progress
  1. Nov 13, 2026 Color matching in progress Color matching is in progress at Swagkeys. Production will start once it is validated.
  2. Aug 7, 2026 Invoice paid The invoice is paid! Production is starting, with an ETA of Q1 2027.
View product
SWG Hypermix Keycaps Est. shipping Q1 2027 In Production Last update · Nov 13, 2026 Color matching in progress
  1. Nov 13, 2026 Color matching in progress Color matching is in progress at Swagkeys.
  2. Nov 1, 2026 Invoice paid We received and paid the invoice from Swagkeys. Production is starting once color matching is validated.
  3. Sep 14, 2026 Order list sent to Swagkeys We sent our order list to Swagkeys and are now waiting for the invoice.
View product
Jahre65 Keyboards Est. shipping Q1 2027 In Production Last update · Jun 6, 2026 Group-buy closed
  1. Jun 6, 2026 Group-buy closed The group-buy ran from May 1 to June 6, 2026. Thank you for joining!
Juna60 Keyboards Est. shipping Q1 2027 In Production Last update · Aug 21, 2026 Production queued at Keyreative
  1. Aug 21, 2026 Production queued at Keyreative According to Keyreative, production is ready to begin and is currently in the queue, with kickoff expected around September. The boards should be completed by November. Since they will travel to our warehouse in France by train, we expect to ship orders around January 2027.
SWG Lavender Keycaps Est. shipping Q1 2027 In Production Last update · Nov 13, 2026 Color matching completed
  1. Nov 13, 2026 Color matching completed Color matching is completed, and the sets are now waiting for production at Swagkeys.
  2. Sep 14, 2026 Invoice paid We received and paid the invoice from Swagkeys. Shipping is planned for Q1 2027.
View product
SWG Midnight Rainbow Keycaps Est. shipping Q1 2027 In Production Last update · Nov 13, 2026 Color matching completed
  1. Nov 13, 2026 Color matching completed Color matching is completed, and the sets are now waiting for production at Swagkeys.
View product
SWG Nerve Keycaps Est. shipping Q2 2027 In Production Last update · Nov 13, 2026 Color matching in progress
  1. Nov 13, 2026 Color matching in progress Color matching is in progress at Swagkeys. Production will start once it is validated, and shipping is still planned for Q2 2027.
  2. Aug 13, 2026 Invoice paid We received and paid the invoice from Swagkeys. Shipping is planned for Q2 2027.
View product
NP-R Numpad Keyboards Est. shipping Q4 2026 In Production Last update · Aug 14, 2026 CNC machining has begun
  1. Aug 14, 2026 CNC machining has begun • CNC machining has begun. There was a slight delay, as the raw material received from the supplier didn’t meet the manufacturer’s quality standards, so it was re-ordered. The new batch has been received and is now being machined. The manufacturer expects to do the surface treatment and finishes (anodizing and coating) around mid-August. • The pre-production packaging sample has been received and approved. Packaging is now being printed. • Batteries, solenoids, feet, force-break foam and silicone inserts have all been completed and delivered to the manufacturer. • Pre-production samples of the solder and hot-swap PCBs have been received. There is a small issue with the solenoid function, which we are currently addressing; everything else works as intended. Production is still scheduled to be completed in Q4 2026.
  2. May 21, 2026 Production is starting TL;DR: all is good, production is starting :) Below is a behind-the-scenes journal, if you’re interested in the process in detail: • After the group-buy ended, it took a few weeks for all vendors to enter their numbers. • Once we had the final numbers, we went back to each supplier and manufacturer to lock in their prices. Some suppliers update their pricing daily or weekly based on the market, so this couldn’t be done until we were ready to pay. That means 4 manufacturers (CNC machining and anodizing, rubber feet / silicone inserts / foam pads, packaging boxes, and PCB fabrication) and 4 suppliers (batteries, electrical components, solenoids, hot-swap sockets). • Hongtu agreed to pay most suppliers upfront; otherwise prices would have changed before each vendor paid its invoice. That meant a big accounting job to charge each of the 9 vendors the right amount for their quantities. • Pre-payment invoices were then sent to vendors, and most have now been paid; the remaining ones are being handled. • Hongtu has ordered the raw material, and production will start as soon as it is received. • Battery production is completed, and the batteries were shipped to Hongtu this morning. • All packaging boxes have been produced and are waiting for the EVA foam cutting before final assembly. All stickers have been made. • Production of the rubber feet, foam pads and silicone inserts is nearly completed.
View product
DCS Olivetti Keycaps Est. shipping To be announced Remake in Production Last update · Nov 10, 2026 Color matching: the set will be remade
  1. Nov 10, 2026 Color matching: the set will be remade Together with the designer and the other vendors, we have been working on the feedback from customers who are not satisfied with the colors. The produced set matches neither the original source material nor the renders used during the group-buy. The issue appears to come from Signature Plastics’ resin supplier, and the set is being remade to match the designer’s original vision. We don’t have a timeline yet, but we will share it as soon as we do. Once the replacement sets are produced, we will send you a form with two options: pay for shipping and receive the replacement set as soon as payment is received, or add it to a future or currently open order at no extra cost.
  2. Aug 22, 2026 Completion expected early September Signature Plastics now expects to complete production around the beginning of September, still in line with their original Q3 estimate. If this estimate holds, we should be able to ship your order around mid-September.
  3. Jun 28, 2026 Completion expected end of July According to Signature Plastics, the sets should be completed by the end of July!
  4. Apr 21, 2026 Pricing lowered Thanks to you, we achieved a great MOQ for this set. Prices have therefore been updated and lowered.
Overture V2 Keyboards Est. shipping Q4 2026 In Production Last update · Sep 18, 2026 Fulfillment expected late Sept – mid-Oct
  1. Sep 18, 2026 Fulfillment expected late Sept – mid-Oct • Cases: CNC machining is wrapping up this week, after which the cases move straight into coloring and surface treatment. • PCBs: manufacturing is wrapping up this week. • Keycaps & carrying bags: both are in production and should be finished in about two weeks. • Switches: the final switch order is being placed this month. Given the current progress, the manufacturer’s ETA for fulfillment is late September at the earliest and mid-October at the latest. We originally planned to ship the boards to our warehouse by rail. If they leave around late September or October, we will keep that option and still dispatch orders within our original Q4 2026 estimate. If not, we will ship everything by air instead.
  2. May 28, 2026 Invoice paid We received and paid the invoice from the manufacturer. Production is starting, and shipping is planned for Q4 2026.
View product
GMK CYL Pandemonium Keycaps Est. shipping End Q4 2026 In Production Last update · Jul 27, 2026 Invoice paid
  1. Jul 27, 2026 Invoice paid We received and paid the invoice from GMK. Production is starting!
View product
SWG Rainbow Alert Keycaps Est. shipping Late January 2027 In Production Last update · Nov 13, 2026 New ETA: late January 2027
  1. Nov 13, 2026 New ETA: late January 2027 Color matching is completed. Swagkeys now plans to ship the sets on January 11, 2027, so we expect to ship your orders in late January 2027.
  2. Jun 24, 2026 Invoice paid The invoice is paid! Production is starting, with an ETA of Q4 2026.
View product
Schema – Bowl x Alexotos Keyboards Est. shipping Q2 – Q3 2026 In Production Last update · Sep 4, 2026 Invoice paid
  1. Sep 4, 2026 Invoice paid We received and paid the invoice from STR. Production is starting!
GMK CYL Selene Keycaps Est. shipping Late Nov – early Dec 2026 In Production Last update · Oct 14, 2026 Production completes November 11
  1. Oct 14, 2026 Production completes November 11 Production should be completed on November 11. With a little margin, we can expect to receive the sets around late November / early December.
  2. Sep 29, 2026 Completion expected in November According to GMK, production should be completed around November.
  3. Jun 28, 2026 Invoice paid We received and paid the invoice. Production is starting!
  4. Jun 18, 2026 Final numbers sent to GMK We sent our final numbers to GMK. We are now waiting for the invoice to start production.
View product
SWG Skeletoon Keycaps Est. shipping Early January 2027 In Production Last update · Nov 13, 2026 New ETA: early January 2027
  1. Nov 13, 2026 New ETA: early January 2027 Color matching is completed. Swagkeys plans to ship the sets on December 23, 2026, so we expect to ship your orders in early January 2027.
View product
DCS Soju Blue Keycaps Est. shipping Q1 2027 In Production Last update · Sep 1, 2026 Invoice paid
  1. Sep 1, 2026 Invoice paid We received and paid the invoice from Signature Plastics. Production is starting!
SWG TARS Keycaps Est. shipping Late February 2027 In Production Last update · Nov 13, 2026 New ETA: late February 2027
  1. Nov 13, 2026 New ETA: late February 2027 Color matching is in progress at Swagkeys. They now plan to ship the sets on February 8, 2027, so we expect to ship your orders in late February 2027.
  2. Jul 5, 2026 Invoice paid The invoice is paid! Production is starting, with an ETA of end of Q4 2026.
View product

Ordered

Deacon by Bowl Keyboards Est. shipping Q3 2027 Ordered Last update · Sep 19, 2026 FCFS sale
  1. Sep 19, 2026 FCFS sale The Deacon FCFS sale opened on September 19, 2026. Thank you for your orders!
Dia by NoNumbers Keyboards Est. shipping Q3 2027 Ordered Last update · Sep 24, 2026 Order list completed
  1. Sep 24, 2026 Order list completed We completed the order list and are still waiting for the invoice to start production.
GMK Evil Lime Keycaps Est. shipping Q2 2027 Ordered Last update · Oct 22, 2026 Group-buy closed
  1. Oct 22, 2026 Group-buy closed The group-buy ran from September 8 to October 22, 2026. Thank you for joining!
SWG Nightshift Keycaps Est. shipping Q3 2027 Pre-Order closing Last update · Oct 30, 2026 Pre-order opens
  1. Oct 30, 2026 Pre-order opens The pre-order is open from October 30 to November 13, 2026.
View product
Nightshift Pangea Mini IM Case Keyboards Est. shipping Q3 2027 Pre-Order closing Last update · Oct 30, 2026 Pre-order opens
  1. Oct 30, 2026 Pre-order opens The pre-order is open from October 30 to November 13, 2026.
View product
Ophanim Keyboards Est. shipping End Q1 – Q2 2027 Ordered Last update · Jul 13, 2026 Production list completed
  1. Jul 13, 2026 Production list completed We completed the production list and are still waiting for the invoice to start production.
SWG Retroguardia Keycaps Est. shipping To be announced Pre-Order open Last update · Nov 9, 2026 Pre-order opens
  1. Nov 9, 2026 Pre-order opens The pre-order is open from November 9 to November 23, 2026.
View product
GMK CYL Varenye Keycaps Est. shipping Q2 2027 Ordered Last update · Oct 12, 2026 Order list sent to GMK
  1. Oct 12, 2026 Order list sent to GMK We sent our order list to GMK and are now waiting for the invoice.
View product

Recently delivered

SWG Bolch Keycaps Status Orders shipped Delivered Last update · Aug 14, 2026 New shipping date: September 18
  1. Aug 14, 2026 New shipping date: September 18 Swagkeys has just updated their shipping estimate for SWG Bolch. Due to the delay on SWG Classic Red, they now plan to ship SWG Bolch on September 18. Allowing for a cautious margin, we expect to receive the sets between late September and early October.
  2. May 1, 2026 Invoice paid, color matching done We just received and paid the invoice for SWG Bolch! Color matching is also completed, and the ETA is now August 2026.
View product
DCS Bowl Pit Keycaps Status Orders shipped Delivered Last update · Aug 22, 2026 Completion expected end of September
  1. Aug 22, 2026 Completion expected end of September According to Signature Plastics, DCS Bowl Pit should be completed around the end of September. If this estimate holds, we expect to start shipping orders around mid-October.
View product
SWG Classic Red Keycaps Status Orders shipped Delivered Last update · Jul 28, 2026 Full batch being re-produced
  1. Jul 28, 2026 Full batch being re-produced Production of SWG Classic Red was nearly completed, but at the very end Swagkeys found slight color variations within the same color range. As they could not guarantee satisfactory quality, they decided to re-produce the entire batch. The new production has already started, and SWG Classic Red should ship around mid-September, still within our original Q3 estimate.
  2. Apr 23, 2026 Invoice paid We received and paid the invoice from Swagkeys. Production is starting!
View product
Motif65 Keyboards Status Orders shipped Delivered Last update · Dec 12, 2025 Cases nearly completed
  1. Dec 12, 2025 Cases nearly completed The keyboard cases are nearly completed: only the badges are missing. STR is still waiting for GMK to finish the keycap set. Color matching at GMK took longer than planned because of the complex design with speckled effects, and the set should enter production very soon. We expect shipping in Q1 to early Q2 2026.
  2. Sep 12, 2025 CNC completed • CNC is completed, and the Cactus (yellow) boards are in surface treatment. • The other parts are completed. • GMK Motif is still in color matching, so we will probably be waiting for GMK at the end of production.
  3. Aug 15, 2025 Delivery expected October 25 Delivery is expected on October 25.
  4. Jun 13, 2025 Invoice paid We received and paid the invoice from the manufacturer! Production is planned to end in September, after which the boards will travel by air from China to our warehouse in France.
DCS Solar Green Keycaps Status Orders shipped Delivered Last update · Aug 14, 2026 Shipped via FedEx
  1. Aug 14, 2026 Shipped via FedEx Signature Plastics shipped the sets via FedEx this week! We expect to receive them by the end of next week, around August 20 or 21.
  2. Jun 28, 2026 Completion expected end of July DCS Solar Green production is progressing very well. According to Signature Plastics, the sets should be completed by the end of July, so we expect to ship them around mid-August.
  3. Apr 11, 2026 Invoice paid We just received and paid the invoice for DCS Solar Green! Production is starting, with an ETA of Q3 2026.
View product
Synovia Keyboards Status Orders shipped Delivered Last update · Jul 18, 2026 CNC nearly completed
  1. Jul 18, 2026 CNC nearly completed CNC work is nearly completed, and anodizing has already started for some colors. Plates, PCBs and packaging should be completed by the end of the month. STR plans to ship the boards from their warehouse around September. The Synovia will then travel by air to our warehouse in France, so we expect to ship orders between the end of September and October, barring delays.
  2. Mar 14, 2026 Machining progressing Machining is progressing well. Unfortunately, production took some time to start, as STR was waiting on late payments from other vendors. Everything is now moving forward, and the ETA is the beginning of Q3 2026.
  3. Dec 15, 2025 Final list sent to STR We sent the complete list to STR, and we should receive the invoice very soon!
  4. Oct 31, 2025 Pre-order opens The pre-order has just started and is open until November 30!

How group-buys & pre-orders work

Production starts once we place the order with the manufacturer. Dates are estimates from our suppliers and can move: every change is posted here and emailed to you.